Architect: Design Life
Quantity Surveyor: Cost and Build Limited
Engineer: Maxis Consultancy
Cost: 264,323,076.00
Outspan Hospital Nyeri is a breath-taking hospital that was built by Devshbhai and Sons Limited. The project started in April 2016 and completed in June 2018. The work was an expansion on the first wing of Outspan Hospital Nyeri.